8.1.1
The inspector is checking whether the vessel's arrangements for use of the oil-tanker inert-gas system are planned, understood and executed using vessel-specific limits, verified line-up, effective communication…
Oil
Open preparation guide →
8.1.2
The inspector is checking whether the vessel's arrangements for crude-oil washing are planned, understood and executed using vessel-specific limits, verified line-up, effective communication and traceable records.
Oil
Open preparation guide →
8.1.3
The inspector is checking whether cargo-tank isolation from the common venting system matches the approved arrangement, is physically ready, is tested through its complete operating path and…
Oil
Open preparation guide →
8.1.4
The inspector is checking whether the vessel's arrangements for oil cargo-tank cleaning are planned, understood and executed using vessel-specific limits, verified line-up, effective communication and traceable records.
Oil
Open preparation guide →
8.2.1
The inspector is checking whether the vessel's arrangements for use of inert gas on a chemical tanker are planned, understood and executed using vessel-specific limits, verified line-up,…
Chemicals
Open preparation guide →
8.2.2
The inspector is checking whether the vessel's arrangements for carriage of inhibited chemical cargoes are planned, understood and executed using vessel-specific limits, verified line-up, effective communication and…
Chemicals
Open preparation guide →
8.2.3
The inspector is checking whether the vessel's arrangements for implementation of the approved Procedures and Arrangements Manual are planned, understood and executed using vessel-specific limits, verified line-up,…
Chemicals
Open preparation guide →
8.2.4
The inspector is checking whether the vessel's arrangements for chemical cargo-tank cleaning are planned, understood and executed using vessel-specific limits, verified line-up, effective communication and traceable records.
Chemicals
Open preparation guide →
8.2.5
The inspector is checking whether the vessel's arrangements for compatibility assessment for chemical cargoes are planned, understood and executed using vessel-specific limits, verified line-up, effective communication and…
Chemicals
Open preparation guide →
8.2.6
The inspector is checking whether the complete arrangement for IBC Code emergency escape respiratory protection meets the cargo-code requirement, remains immediately usable and is understood by the…
Chemicals
Open preparation guide →
8.2.7
The inspector is checking whether the complete arrangement for IBC Code safety and emergency equipment meets the cargo-code requirement, remains immediately usable and is understood by the…
Chemicals
Open preparation guide →
8.2.8
The inspector is checking whether the complete arrangement for IBC Code personnel protective equipment meets the cargo-code requirement, remains immediately usable and is understood by the personnel…
Chemicals
Open preparation guide →
8.3.1
The inspector is checking whether the inert-gas generator matches the approved arrangement, is physically ready, is tested through its complete operating path and is understood by responsible…
Oil and Chemical
Open preparation guide →
8.3.2
The inspector is checking whether the nitrogen-generator inert-gas system matches the approved arrangement, is physically ready, is tested through its complete operating path and is understood by…
Oil and Chemical
Open preparation guide →
8.3.3
The inspector is checking whether the flue-gas inert-gas system matches the approved arrangement, is physically ready, is tested through its complete operating path and is understood by…
Oil and Chemical
Open preparation guide →
8.3.4
The inspector is checking whether independent cargo-tank high-level and overfill protection matches the approved arrangement, is physically ready, is tested through its complete operating path and is…
Oil and Chemical
Open preparation guide →
8.3.5
The inspector is checking whether the vessel's arrangements for gauging and sampling static-accumulator cargoes in non-inerted tanks are planned, understood and executed using vessel-specific limits, verified line-up,…
Oil and Chemical
Open preparation guide →
8.3.6
The inspector is checking whether the vessel's arrangements for loading static-accumulator cargoes into non-inerted tanks are planned, understood and executed using vessel-specific limits, verified line-up, effective communication…
Oil and Chemical
Open preparation guide →
8.3.7
The inspector is checking whether the inert-gas oxygen analyser and associated sampling arrangement matches the approved arrangement, is physically ready, is tested through its complete operating path…
Oil and Chemical
Open preparation guide →
8.3.8
The inspector is checking whether cargo-pump emergency stops and ESD controls matches the approved arrangement, is physically ready, is tested through its complete operating path and is…
Oil and Chemical
Open preparation guide →
8.3.9
The inspector is checking whether cargo, inert-gas and vapour pipelines matches the approved arrangement, is physically ready, is tested through its complete operating path and is understood…
Oil and Chemical
Open preparation guide →
8.3.10
The inspector is checking whether the vapour-collection and shore-return system matches the approved arrangement, is physically ready, is tested through its complete operating path and is understood…
Oil and Chemical
Open preparation guide →
8.3.11
The inspector is checking whether the vessel's arrangements for tank cleaning on an oil or chemical tank that is not inerted are planned, understood and executed using…
Oil and Chemical
Open preparation guide →
8.3.12
The inspector is checking whether portable ullage, temperature, interface and sampling equipment matches the approved arrangement, is physically ready, is tested through its complete operating path and…
Oil and Chemical
Open preparation guide →
8.3.13
The inspector is checking whether the secondary cargo-tank pressure and vacuum protection matches the approved arrangement, is physically ready, is tested through its complete operating path and…
Oil and Chemical
Open preparation guide →
8.3.14
The inspector is checking whether the cargo-tank venting system matches the approved arrangement, is physically ready, is tested through its complete operating path and is understood by…
Oil and Chemical
Open preparation guide →
8.3.15
The inspector is checking whether the vessel's arrangements for purging deepwell cargo-pump cofferdams are planned, understood and executed using vessel-specific limits, verified line-up, effective communication and traceable…
Oil and Chemical
Open preparation guide →
8.3.16
The inspector is checking whether inert-gas non-return devices matches the approved arrangement, is physically ready, is tested through its complete operating path and is understood by responsible…
Oil and Chemical
Open preparation guide →
8.3.17
The inspector is checking whether cargo-manifold reducers, spool pieces and portable connections matches the approved arrangement, is physically ready, is tested through its complete operating path and…
Oil and Chemical
Open preparation guide →
8.3.18
The inspector is checking whether the inert-gas pressure and vacuum breaker matches the approved arrangement, is physically ready, is tested through its complete operating path and is…
Oil and Chemical
Open preparation guide →
8.3.19
The inspector is checking whether inert-gas pressure, oxygen, temperature, flow and plant alarms matches the approved arrangement, is physically ready, is tested through its complete operating path…
Oil and Chemical
Open preparation guide →
8.3.20
The inspector is checking whether connections and interconnections to the inert-gas system matches the approved arrangement, is physically ready, is tested through its complete operating path and…
Oil and Chemical
Open preparation guide →
8.3.21
The inspector is checking whether the cargo heating system matches the approved arrangement, is physically ready, is tested through its complete operating path and is understood by…
Oil and Chemical
Open preparation guide →
8.3.22
The inspector is checking whether the vessel's arrangements for addition of cargo additives or dyes are planned, understood and executed using vessel-specific limits, verified line-up, effective communication…
Oil and Chemical
Open preparation guide →
8.3.23
The inspector is checking whether the cargo-tank temperature monitoring system matches the approved arrangement, is physically ready, is tested through its complete operating path and is understood…
Oil and Chemical
Open preparation guide →
8.3.24
The inspector is checking whether cargo-manifold valves, flanges, blanks, drains, supports and identification matches the approved arrangement, is physically ready, is tested through its complete operating path…
Oil and Chemical
Open preparation guide →
8.3.25
The inspector is checking whether the vessel's arrangements for receiving nitrogen from a shore source are planned, understood and executed using vessel-specific limits, verified line-up, effective communication…
Oil and Chemical
Open preparation guide →
8.4.1
The inspector is checking whether the vessel's arrangements for carriage of inhibited LPG cargoes are planned, understood and executed using vessel-specific limits, verified line-up, effective communication and…
LPG
Open preparation guide →
8.4.2
The inspector is checking whether the vessel's arrangements for sampling liquefied-gas cargo are planned, understood and executed using vessel-specific limits, verified line-up, effective communication and traceable records.
LPG
Open preparation guide →
8.4.3
The inspector is checking whether the vessel's arrangements for segregation of incompatible LPG cargoes and refrigerants are planned, understood and executed using vessel-specific limits, verified line-up, effective…
LPG
Open preparation guide →
8.4.4
The inspector is checking whether the vessel's arrangements for carriage of propylene oxide or ethylene oxide are planned, understood and executed using vessel-specific limits, verified line-up, effective…
LPG
Open preparation guide →
8.4.5
The inspector is checking whether the complete arrangement for IGC Code emergency escape respiratory protection meets the cargo-code requirement, remains immediately usable and is understood by the…
LPG
Open preparation guide →
8.4.6
The inspector is checking whether cargo-tank insulation matches the approved arrangement, is physically ready, is tested through its complete operating path and is understood by responsible personnel.
LPG
Open preparation guide →
8.4.7
The inspector is checking whether vent-outlet protection screens or flame screens matches the approved arrangement, is physically ready, is tested through its complete operating path and is…
LPG
Open preparation guide →
8.5.1
The inspector is checking whether the LNG custody-transfer measurement system matches the approved arrangement, is physically ready, is tested through its complete operating path and is understood…
LNG
Open preparation guide →
8.5.2
The inspector is checking whether the gas combustion unit matches the approved arrangement, is physically ready, is tested through its complete operating path and is understood by…
LNG
Open preparation guide →
8.5.3
The inspector is checking whether the LNG gas-fuel supply system matches the approved arrangement, is physically ready, is tested through its complete operating path and is understood…
LNG
Open preparation guide →
8.5.4
The inspector is checking whether cold-spot, cofferdam temperature and heating equipment matches the approved arrangement, is physically ready, is tested through its complete operating path and is…
LNG
Open preparation guide →
8.6.1
The inspector is checking whether independent gas-carrier high-level and overfill protection matches the approved arrangement, is physically ready, is tested through its complete operating path and is…
Gas (common to all vessels under IGC Code)
Open preparation guide →
8.6.2
The inspector is checking whether the gas cargo-transfer emergency shutdown system matches the approved arrangement, is physically ready, is tested through its complete operating path and is…
Gas (common to all vessels under IGC Code)
Open preparation guide →
8.6.3
The inspector is checking whether cargo-tank pressure-relief valves matches the approved arrangement, is physically ready, is tested through its complete operating path and is understood by responsible…
Gas (common to all vessels under IGC Code)
Open preparation guide →
8.6.4
The inspector is checking whether the vessel's arrangements for use of the ship-specific Cargo System Operation Manual are planned, understood and executed using vessel-specific limits, verified line-up,…
Gas (common to all vessels under IGC Code)
Open preparation guide →
8.6.5
The inspector is checking whether the interbarrier and hold-space atmosphere-control system matches the approved arrangement, is physically ready, is tested through its complete operating path and is…
Gas (common to all vessels under IGC Code)
Open preparation guide →
8.6.6
The inspector is checking whether the vessel's arrangements for management of gas-carrier cargo-system alarms are planned, understood and executed using vessel-specific limits, verified line-up, effective communication and…
Gas (common to all vessels under IGC Code)
Open preparation guide →
8.6.7
The inspector is checking whether the gas-carrier inert-gas or nitrogen system matches the approved arrangement, is physically ready, is tested through its complete operating path and is…
Gas (common to all vessels under IGC Code)
Open preparation guide →
8.6.8
The inspector is checking whether gas-carrier liquid and vapour manifolds matches the approved arrangement, is physically ready, is tested through its complete operating path and is understood…
Gas (common to all vessels under IGC Code)
Open preparation guide →
8.6.9
The inspector is checking whether gas-carrier reducers, spool pieces and portable pipework matches the approved arrangement, is physically ready, is tested through its complete operating path and…
Gas (common to all vessels under IGC Code)
Open preparation guide →
8.6.10
The inspector is checking whether the vessel's arrangements for emergency discharge of gas cargo are planned, understood and executed using vessel-specific limits, verified line-up, effective communication and…
Gas (common to all vessels under IGC Code)
Open preparation guide →
8.6.11
The inspector is checking whether cargo and vapour pipeline insulation and expansion arrangements matches the approved arrangement, is physically ready, is tested through its complete operating path…
Gas (common to all vessels under IGC Code)
Open preparation guide →
8.6.12
The inspector is checking whether the complete arrangement for IGC Code safety, rescue and recovery equipment meets the cargo-code requirement, remains immediately usable and is understood by…
Gas (common to all vessels under IGC Code)
Open preparation guide →
8.6.13
The inspector is checking whether the complete arrangement for IGC Code personnel protective equipment meets the cargo-code requirement, remains immediately usable and is understood by the personnel…
Gas (common to all vessels under IGC Code)
Open preparation guide →
8.6.14
The inspector is checking whether the cargo reliquefaction plant matches the approved arrangement, is physically ready, is tested through its complete operating path and is understood by…
Gas (common to all vessels under IGC Code)
Open preparation guide →
8.6.15
The inspector is checking whether cargo heaters, vaporisers and condensers matches the approved arrangement, is physically ready, is tested through its complete operating path and is understood…
Gas (common to all vessels under IGC Code)
Open preparation guide →
8.6.16
The inspector is checking whether the vessel's arrangements for calculation and control of filling limits and loading limits are planned, understood and executed using vessel-specific limits, verified…
Gas (common to all vessels under IGC Code)
Open preparation guide →
8.6.17
The inspector is checking whether the vent-mast fire-suppression arrangement matches the approved arrangement, is physically ready, is tested through its complete operating path and is understood by…
Gas (common to all vessels under IGC Code)
Open preparation guide →
8.6.18
The inspector is checking whether the vessel's arrangements for response to water or liquid cargo leakage into a hold, interbarrier or insulation space are planned, understood and…
Gas (common to all vessels under IGC Code)
Open preparation guide →
8.6.19
The inspector is checking whether submerged-motor electric cargo pumps matches the approved arrangement, is physically ready, is tested through its complete operating path and is understood by…
Gas (common to all vessels under IGC Code)
Open preparation guide →
8.6.20
The inspector is checking whether liquid-line, hold-space, insulation-space and interbarrier-space relief valves matches the approved arrangement, is physically ready, is tested through its complete operating path and…
Gas (common to all vessels under IGC Code)
Open preparation guide →
8.6.21
The inspector is checking whether the vessel's arrangements for gas-carrier inerting, gas-freeing and gassing-up are planned, understood and executed using vessel-specific limits, verified line-up, effective communication and…
Gas (common to all vessels under IGC Code)
Open preparation guide →
8.7.1
The inspector is checking whether the bow-loading system emergency shutdown arrangement matches the approved arrangement, is physically ready, is tested through its complete operating path and is…
Shuttle Tanker Cargo Operations
Open preparation guide →
8.7.2
The inspector is checking whether the vessel's arrangements for approach to an offshore loading terminal are planned, understood and executed using vessel-specific limits, verified line-up, effective communication…
Shuttle Tanker Cargo Operations
Open preparation guide →
8.7.3
The inspector is checking whether the vessel's arrangements for control and monitoring of the bow-loading system are planned, understood and executed using vessel-specific limits, verified line-up, effective…
Shuttle Tanker Cargo Operations
Open preparation guide →
8.7.4
The inspector is checking whether the bow-loading system matches the approved arrangement, is physically ready, is tested through its complete operating path and is understood by responsible…
Shuttle Tanker Cargo Operations
Open preparation guide →
8.7.5
The inspector is checking whether the bow-loading-area deluge system matches the approved arrangement, is physically ready, is tested through its complete operating path and is understood by…
Shuttle Tanker Cargo Operations
Open preparation guide →
8.7.6
The inspector is checking whether the bow-loading-area fixed foam system matches the approved arrangement, is physically ready, is tested through its complete operating path and is understood…
Shuttle Tanker Cargo Operations
Open preparation guide →
8.7.7
The inspector is checking whether the shuttle tanker's dynamic-positioning equipment matches the approved arrangement, is physically ready, is tested through its complete operating path and is understood…
Shuttle Tanker Cargo Operations
Open preparation guide →
8.7.8
The inspector is checking whether the vessel's arrangements for use and maintenance of the DP FMEA and proving trials are planned, understood and executed using vessel-specific limits,…
Shuttle Tanker Cargo Operations
Open preparation guide →
8.7.9
The inspector is checking whether fire and gas detection in the bow-loading area matches the approved arrangement, is physically ready, is tested through its complete operating path…
Shuttle Tanker Cargo Operations
Open preparation guide →
8.8.1
The inspector is checking whether cargo-hold hatch covers on an OBO or combination carrier matches the approved arrangement, is physically ready, is tested through its complete operating…
OBO / Combination Carriers
Open preparation guide →
8.8.2
The inspector is checking whether the vessel's arrangements for conversion between liquid and dry-bulk cargo service are planned, understood and executed using vessel-specific limits, verified line-up, effective…
OBO / Combination Carriers
Open preparation guide →
8.99.1
The inspector is checking whether the vessel's arrangements for cargo and ballast transfer planning and execution are planned, understood and executed using vessel-specific limits, verified line-up, effective…
All types
Open preparation guide →
8.99.2
The inspector is checking whether the vessel's arrangements for completion and continuing use of the Ship/Shore Safety Checklist are planned, understood and executed using vessel-specific limits, verified…
All types
Open preparation guide →
8.99.3
The inspector is checking whether the vessel's arrangements for manning and supervision of cargo and ballast operations are planned, understood and executed using vessel-specific limits, verified line-up,…
All types
Open preparation guide →
8.99.4
The inspector is checking whether cargo and ballast valves and remote-control systems matches the approved arrangement, is physically ready, is tested through its complete operating path and…
All types
Open preparation guide →
8.99.5
The inspector is checking whether the fixed cargo-tank level-gauging system matches the approved arrangement, is physically ready, is tested through its complete operating path and is understood…
All types
Open preparation guide →
8.99.6
The inspector is checking whether the approved stability and loading instrument matches the approved arrangement, is physically ready, is tested through its complete operating path and is…
All types
Open preparation guide →
8.99.7
The inspector is checking whether the vessel's arrangements for control of vessel-specific loading restrictions and intact-stability concerns are planned, understood and executed using vessel-specific limits, verified line-up,…
All types
Open preparation guide →
8.99.8
The inspector is checking whether shipboard cargo-transfer hoses matches the approved arrangement, is physically ready, is tested through its complete operating path and is understood by responsible…
All types
Open preparation guide →
8.99.9
The inspector is checking whether cargo and ballast controls, indicators, mimics and displays matches the approved arrangement, is physically ready, is tested through its complete operating path…
All types
Open preparation guide →
8.99.10
The inspector is checking whether cargo-system bonding arrangements matches the approved arrangement, is physically ready, is tested through its complete operating path and is understood by responsible…
All types
Open preparation guide →
8.99.11
The inspector is checking whether the vessel's arrangements for independent verification of the complete cargo liquid, vapour and venting line-up are planned, understood and executed using vessel-specific…
All types
Open preparation guide →
No matching questions found.