QUESTION 8.3.25

Receiving nitrogen from shore

Oil, ChemicalCargo Control Room

What is being checked

The inspector is checking whether the vessel's arrangements for receiving nitrogen from a shore source are planned, understood and executed using vessel-specific limits, verified line-up, effective communication and traceable records.

Ready onboard

0/6 complete

Practice questions

Answer aloud, then open the preparation point.

1What are the critical controls for receiving nitrogen from a shore source?

Explain the vessel-specific sequence, limits and safeguards for maximum flow and pressure, oxygen content, dew point, connection, tank vent capacity, communication, non-return protection and emergency stop.

2How was the line-up independently verified?

Identify both verifiers, the physical route checked, valve-position confirmation and the record completed before starting.

3What conditions require the operation to stop?

Stop for loss of communication, unexpected pressure or level, leakage, alarm, incorrect line-up or any of these specific failures: overpressure, uncontrolled flow, wrong purity, incompatible connection, air or cargo backflow or loss of communication.

4Show the most recent complete operation.

Trace the plan through terminal agreement, nitrogen certificate, pressure calculation, line-up check, tank-pressure trend and completion record, including any deviation and its authorisation.

5What is the first response to an abnormal condition?

Stop or stabilise the operation, raise the alarm, isolate the source where safe, verify tank and system condition and coordinate with the terminal and Master.

Where an observation may arise

PROCEDURE GAP

The vessel procedure did not adequately address maximum flow and pressure, oxygen content, dew point, connection, tank vent capacity, communication, non-return protection and emergency stop.

GENERIC PLAN

The plan was copied or did not reflect the actual cargo, tank condition, terminal limits or equipment status.

LINE-UP ERROR

A critical valve or connection was not independently checked, or the recorded position conflicted with the physical system.

KNOWLEDGE GAP

Responsible personnel could not explain their limits, monitoring duty, communications or stop-work authority.

RECORD CONFLICT

The plan, log or checklist could not be reconciled with terminal agreement, nitrogen certificate, pressure calculation, line-up check, tank-pressure trend and completion record.

ABNORMALITY UNCONTROLLED

The response did not adequately control overpressure, uncontrolled flow, wrong purity, incompatible connection, air or cargo backflow or loss of communication.

Master's practical note

Use the latest real operation, not a model checklist. Follow one critical parameter from the agreed plan to the CCR display, deck condition and final record.

Equipment boundary and references

Equipment boundary: Apply the vessel's approved cargo manuals, cargo-specific data, terminal agreement and company limits. Do not operate cargo equipment solely to demonstrate it during an inspection.

References

  • OCIMF SIRE 2.0 Question Library Part 2, Version 1.0, Question 8.3.25
  • OCIMF ISGOTT, Sixth Edition
  • IMO IBC Code

Last reviewed: 2026-09-14