Section 5: Pollution Prevention and Control
Pollution records, ballast and bilge systems, waste handling, emissions and sewage treatment.
Vessel type alone does not determine applicability. Check each entry’s cargo, equipment and other conditions; this selector does not set an inspection response.
Oil Record Book Part I
Machinery-space oil operations are recorded under the correct codes.
Open preparation guide →SOPEP approval, contacts and crew duties
The approved pollution response plan is current and understood.
Open preparation guide →Operational waste, cargo residues and deck containment
Personnel understand Annex V waste controls and maintain deck containment.
Open preparation guide →Visible bulkhead and structural leakage
Accessible boundaries show no visible leakage.
Open preparation guide →Cargo-hold bilges and non-return valves
Bilge systems are clean, tested and correctly isolated.
Open preparation guide →Soundings and water-accumulation monitoring
Regular monitoring identifies accumulating water.
Open preparation guide →Deck hydraulic-oil containment
Deck hydraulic components have suitable spill containment.
Open preparation guide →Emergency drainage forward of the collision bulkhead
Forward-space flooding arrangements are identified and operable.
Open preparation guide →Ballast-water treatment, records and failures
The approved ballast plan is followed and treatment performance is verified.
Open preparation guide →Oil contamination of ballast before discharge
At-risk ballast is checked for oil contamination before discharge.
Open preparation guide →Emergency bilge valves, seals and suction access
Emergency bilge arrangements are protected yet immediately available.
Open preparation guide →Sludge-collecting pump discharge connections
Sludge-collecting pumps have no direct overboard connection.
Open preparation guide →Oil-filtering equipment and representative sampling
Filtering, sampling, alarms and automatic stopping work together.
Open preparation guide →Shipper’s HME cargo declaration
Cargo environmental classification is declared and controls residue disposal.
Open preparation guide →Garbage plan, records and storage
Garbage handling follows the plan and disposal records are traceable.
Open preparation guide →SEEMP, fuel data and carbon-intensity follow-up
The ship’s energy-efficiency plan and applicable verification records are available.
Open preparation guide →Scrubber operation, maintenance and failure response
Engineers operate and maintain the approved EGCS with effective failure controls.
Open preparation guide →Ballast pumps, valve controls and instrumentation
Ballast-system controls and indications match actual plant operation.
Open preparation guide →Bunker and ballast manhole condition
Manhole gaskets and fastenings remain sound.
Open preparation guide →Sewage-treatment plant and crew familiarity
The fitted sewage plant is maintained and its operation understood.
Open preparation guide →No matching entries found.
References 5.4, 5.11, 5.16, 5.17, 5.20, 5.22 and 5.24 were removed in RISQ 3.2. Removed references are excluded from active entries.
Independent DeepDraft preparation guide, based on the supplied RISQ 3.2 questionnaire. Not an official RightShip product or inspection report.