Under-keel-clearance control
What is being checked
The inspector is checking whether the vessel maintains company-required static and dynamic UKC at every critical point using realistic depth, tide, squat, heel and survey-accuracy inputs, and whether plans, records and interviews demonstrate that the procedure is applied during real voyages rather than completed only as paperwork.
Ready onboard
0/6 completePractice questions
Answer aloud, then open the preparation point.
1What is the operational purpose of under-keel-clearance control?
The vessel maintains company-required static and dynamic ukc at every critical point using realistic depth, tide, squat, heel and survey-accuracy inputs.
2Show how the procedure was applied on the last voyage.
Recalculate the latest critical point from charted depth, height of tide, draft, squat, heel or list, density, wave allowance, CATZOC and company margin.
3Which decision requires the Master's judgement?
The Master decides whether source uncertainty and actual conditions justify an allowance greater than the policy minimum or require speed, timing, route or loading change.
4What happens if the planned control becomes invalid?
Reduce speed or alter timing and route as safe, obtain updated local data, recalculate, notify the company or authority under policy and do not proceed below an authorised safe margin.
5How are changes communicated and recorded?
Brief the affected bridge and machinery personnel, amend the controlled plan or record, obtain required approval and retain the reason and revised limits.
Where an observation may arise
Records exist but the bridge team cannot relate them to the actual voyage or operation.
A material change is not reassessed, approved, briefed or recorded.
Depth and positional survey uncertainty are ignored without better local information.
Squat, heel, wave response or density is excluded from a dynamic condition.
Predicted tide is used despite known meteorological or local variation without assessment.
Past observations for practice
The squat tables displayed on the bridge did not match the squat calculations issued from the software required to be used for UKC assessment.
The OP was not aware of how to apply allowance to UKC for barometric pressure. Operator's procedures gave specific guidance.
The shallow depth alarm was set to 4.00 mtrs at echo sounder, which was not suitable as a higher setting for pre-warning, while the minimum UKC required was 0.70 mtrs at berth as per SMS.
Master's practical note
Recalculate one critical point independently. The most common weakness is not arithmetic but an input presented as exact despite survey, tide or squat uncertainty.
Equipment boundary and references
Equipment boundary: No universal CATZOC deduction is prescribed by OCIMF. The company policy and Master's documented assessment must use available survey and local information rationally.
References
- OCIMF SIRE 2.0 Question Library Part 1, Version 1.0, Question 4.2.2
- IMO Resolution A.893(21)
- OCIMF Recommendations on Usage of ECDIS and Preventing Incidents
- ICS Bridge Procedures Guide