Testing propulsion, steering, thrusters and power generation
What is being checked
The inspector is checking whether machinery required for safe navigation is tested at the correct voyage stages, defects are acted upon and bridge and engine records agree.
Ready onboard
0/6 completePractice questions
Answer aloud, then open the preparation point.
1When were steering-gear tests last completed and who participated?
Show the dated bridge and steering-flat records and identify the checks, communications and personnel involved.
2What changes when entering restricted waters?
Bring required propulsion, steering, thruster and electrical redundancy into readiness according to the passage plan and SMS.
3How do you test ahead and astern response safely?
Coordinate with the bridge and deck, confirm clearance and plant readiness, then record actual response under the vessel procedure.
4What happens if one steering power unit fails its test?
Notify the Master, control the defect, assess redundancy and statutory limits, repair or obtain formal authority before sailing.
5How are bridge and engine records reconciled?
Compare time-stamped checklists, logbooks, telegraph or automation records and explain any genuine difference.
Where an observation may arise
A statutory or company test was late or omitted.
The checklist was signed without testing all fitted control positions, alarms or standby systems.
Bridge and engine-room records show incompatible times or results.
A failed or abnormal result did not trigger control before manoeuvring.
Responsible officers cannot explain the test sequence or failure response.
Master's practical note
Select the last arrival or departure and reconcile both departments' records. Identical pre-filled times are not persuasive if the actual test sequence cannot be explained.
Equipment boundary and references
Equipment boundary: Testing intervals and equipment scope depend on SOLAS, coastal-state rules, company procedure and fitted plant. Do not operate machinery merely to demonstrate it when conditions are unsafe.
References
- OCIMF SIRE 2.0 Question Library Part 2, Version 1.0, Question 10.1.2
- SOLAS Chapter V regulation 26
- SOLAS Chapter II-1
- ICS Bridge Procedures Guide
- ICS Engine Room Procedures Guide
Last reviewed: 2026-09-10