Machinery-space rounds on continuously manned vessels
What is being checked
The inspector is checking whether scheduled rounds on a manned machinery space detect leakage, abnormal temperature, vibration, sound, level and operating trends before they become failures.
Ready onboard
0/6 completePractice questions
Answer aloud, then open the preparation point.
1What do you check that the automation system cannot show?
Look for local leakage, smell, vibration, unusual sound, hot spots, loose fittings, bilge condition and unsafe housekeeping.
2How do you respond to a slowly rising bearing temperature?
Verify locally, compare load and trend, notify as required and intervene before the alarm becomes the first action.
3Show one abnormal round entry and its closure.
Trace the reading or observation through notification, work order, repair and subsequent verification.
4Can a round be completed from the ECR?
No. Control-room data supports but does not replace the required physical inspection.
5How is an open defect handed over?
Record the condition, limitation, monitoring frequency and action, then obtain clear watchkeeper acknowledgement.
Where an observation may arise
Readings were copied without a physical inspection.
Remote or low-frequency areas were excluded from the route.
Abnormal movement was recorded repeatedly without recognition or action.
Identical or inconsistent readings undermine record credibility.
The relieving watchkeeper is unaware of an active abnormality.
Master's practical note
Walk part of the route with the duty engineer and compare one local indication with the log. The quality of the round is measured by what it detects, not by how neatly the sheet is completed.
Equipment boundary and references
Equipment boundary: This question concerns vessels operated with a continuously manned machinery space. Where the ship also uses UMS periods, the controls in Question 10.1.4 apply to those periods.
References
- OCIMF SIRE 2.0 Question Library Part 2, Version 1.0, Question 10.1.3
- STCW Code section A-VIII/2
- ICS Engine Room Procedures Guide
- ISM Code section 10
Last reviewed: 2026-09-10
