Cargo overboard and sea-suction valve isolation
What is being checked
The inspector is checking whether every cargo-system overboard and sea-suction valve is closed, secured and verified before cargo transfer, and whether fitted leakage-monitoring and integrity-test arrangements remain effective.
Ready onboard
0/7 completePractice questions
Answer aloud, then open the preparation point.
1Show how cargo sea and overboard valves were secured before the current transfer.
Identify each applicable valve and the physical lock, tag, blank or approved indication, then match it to the signed checklist.
2How do you detect leakage past a closed sea valve?
Use the fitted pressure, vacuum or sampling arrangement from its safe reading point and explain the normal indication and escalation criteria.
3When was the last between-drydock integrity test and what pressure limit applied?
Show the approved test procedure, maximum permitted pressure, result, instrument details and defect closure.
4What precautions apply when taking ballast into cargo tanks or displacing a line with seawater?
Use the specific authorised procedure, verify valve alignment and containment, control cross-connection risk and record the operation.
5What would you do if leakage were suspected during cargo transfer?
Stop or suspend the operation as required, isolate the system, notify the terminal and Master, contain the risk and investigate under the emergency procedure.
Where an observation may arise
A cargo overboard or sea-suction valve is not fully closed or not secured before transfer.
Pre-transfer verification or periodic leakage checks are not documented.
The monitoring gauge or sample indicates leakage past a valve.
Between-drydock integrity testing is absent, overdue or performed above the approved pressure.
A gauge, blank, securing device or leak-detection connection is missing or defective.
Required anti-pollution notices are absent or the officer cannot explain the control.
Master's practical note
Physically verify the isolation boundary with the responsible officer. A ticked checklist is secondary evidence; valve position, securing method, blanking and leak indication must all tell the same story.
Equipment boundary and references
Equipment boundary: Valve design and approved isolation method vary. Do not pressure-test or manipulate cargo sea valves during operations outside the vessel's approved procedure and terminal agreement.
References
- OCIMF SIRE 2.0 Question Library Part 1, Version 1.0, Question 6.2.2
- MARPOL Annex I
- ISGOTT, current edition
- Vessel cargo and ballast system drawings