Electric-welding equipment and return-current safety
What is being checked
The inspector is checking whether electric welding is conducted with sound equipment, correct return-current arrangements, effective isolation and precautions that prevent shock, fire and stray-current damage.
Ready onboard
0/6 completePractice questions
Answer aloud, then open the preparation point.
1Where must the return clamp be connected?
Directly to clean metal on the workpiece or approved point close to the weld so current does not pass through machinery or bearings.
2Why is the hull not an acceptable default return?
Uncontrolled current can arc across bearings, damage equipment and create ignition paths remote from the work.
3What extra controls apply in a damp or confined location?
Use the approved low-risk equipment and insulation, ventilation, rescue, gas testing and permit controls; stop if safe conditions cannot be established.
4What defects require withdrawal from service?
Exposed conductors, damaged insulation, overheating, loose connectors, defective holder, casing damage or unreliable isolation.
5Does a welding-machine inspection replace the hot-work permit?
No. Equipment condition and worksite fire or atmosphere control are separate requirements.
Where an observation may arise
The return path can pass through machinery, bearings, pipes or structure.
Conductors or connectors are exposed, overheated or repaired improperly.
Shock protection is inadequate for damp or conductive conditions.
The unit remains energised without control.
Users cannot explain posted precautions or emergency isolation.
Master's practical note
Follow the return lead physically. Many welding arrangements appear serviceable until the clamp location reveals a current path through propulsion or other critical machinery.
Equipment boundary and references
Equipment boundary: Welding in tanks, confined spaces, cargo areas or on fuel boundaries requires additional restrictions and permits. Follow the equipment maker and vessel hot-work procedure.
References
- OCIMF SIRE 2.0 Question Library Part 2, Version 1.0, Question 10.3.8
- SOLAS Chapter II-2
- ISM Code sections 7 and 10
- Company hot-work procedure
- IEC 60974 series
Last reviewed: 2026-09-10
