Bunker manifold instruments and blanks
Applicability: Apply the arrangements and conditions stated in this entry to the vessel.
What is being checked
Manifold fittings work and unused connections are blanked.
Ready on board
0 / 2 checkedCheck the vessel’s actual procedures, equipment and records against these points from RISQ 3.2.
Practice questions
Preparation prompts derived from this entry, not an official inspector interview script.
1Which manifold items are included?
Drains, vents, pressure gauges, thermometers and blanks for unused connections.
Where a finding may arise
Missing evidence or defects inconsistent with the checks above may prevent a satisfactory answer. These are preparation concerns derived from the question, not explicit additional finding criteria or reported past observations.
Past observations for practice
Anonymised reports, manually reviewed before publication. These are reported experiences, not additional inspection requirements.
No reviewed observations have been added for this entry.
Share an observation for private review
Remove vessel, company and inspector names, report numbers, exact dates and confidential information. Do not paste a complete inspection report.
Source clarification
No additional inspection guidance is supplied for this question.
References and source status
RightShip Inspection Ship Questionnaire, November 2025, version 3.2. Section 7A, page 85, reference 7.3.
The explanation, checklist and practice answer derive from the supplied questionnaire. Reported observations are separately contributed and manually reviewed; they are not official RISQ guidance.
Independent DeepDraft preparation guide, based on the supplied RISQ 3.2 questionnaire. Not an official RightShip product or inspection report.