Tunnel hydraulics and leakage
Applicability: Gravity-based and/or hybrid self-unloading vessels discharging bulk cargo ashore or offshore. Complete Section 8E together with 8A and/or 8B as appropriate to the cargo.
What is being checked
Hydraulic components are sound and free of oil leakage.
Ready on board
0 / 2 checkedCheck the vessel’s actual procedures, equipment and records against these points from RISQ 3.2.
Practice questions
Preparation prompts derived from this entry, not an official inspector interview script.
1Can visible oil leakage be treated only as a housekeeping issue?
No. The source expressly requires a finding.
Where a finding may arise
Explicit RISQ trigger: evidence of oil leakage from the tunnel-conveyor hydraulic arrangement.
Past observations for practice
Anonymised reports, manually reviewed before publication. These are reported experiences, not additional inspection requirements.
No reviewed observations have been added for this entry.
Share an observation for private review
Remove vessel, company and inspector names, report numbers, exact dates and confidential information. Do not paste a complete inspection report.
References and source status
RightShip Inspection Ship Questionnaire, November 2025, version 3.2. Section 8E, page 161, reference 8.14.
The explanation, checklist and practice answer derive from the supplied questionnaire. Reported observations are separately contributed and manually reviewed; they are not official RISQ guidance.
Independent DeepDraft preparation guide, based on the supplied RISQ 3.2 questionnaire. Not an official RightShip product or inspection report.