Grain-clean standard and independent inspection
Applicability: Bulk grain, not bagged grain. RISQ 8B normally requires the grain authorisation and loading manual and grain on board; a brief period without grain may be assessed if procedures can be adequately checked and the circumstances are recorded. See 8B.5 for the separate no-authorisation provision.
What is being checked
Holds meet the required cleanliness standard before grain loading.
Ready on board
0 / 6 checkedCheck the vessel’s actual procedures, equipment and records against these points from RISQ 3.2.
Practice questions
Preparation prompts derived from this entry, not an official inspector interview script.
1Does grain clean mean every surface must have intact paint?
No. The source assigns that coating standard to hospital clean; grain clean focuses on cleanliness, dryness, odour/gas and loose scale.
Where a finding may arise
Missing evidence, unsafe arrangements or gaps in familiarity against the checks above may prevent a satisfactory answer. These are derived preparation concerns, not additional explicit finding criteria or reported past observations.
Past observations for practice
Anonymised reports, manually reviewed before publication. These are reported experiences, not additional inspection requirements.
No reviewed observations have been added for this entry.
Share an observation for private review
Remove vessel, company and inspector names, report numbers, exact dates and confidential information. Do not paste a complete inspection report.
Source clarification
Cargo, port and shipper requirements determine the applicable standard. The source’s examples do not make hospital clean compulsory for every grain shipment.
References and source status
RightShip Inspection Ship Questionnaire, November 2025, version 3.2. Section 8B, page 123, reference 8.10.
The explanation, checklist and practice answer derive from the supplied questionnaire. Reported observations are separately contributed and manually reviewed; they are not official RISQ guidance.
Independent DeepDraft preparation guide, based on the supplied RISQ 3.2 questionnaire. Not an official RightShip product or inspection report.