Maritime analysis. Real-time insight.

RightShip Guide

THE DEEPDRAFT · RIGHTSHIP PREPARATION

Audits, superintendent visits and corrective action

RISQ 4.3Section 4 · ISM System

Applicability: All vessel types; apply the equipment and operational conditions stated in this entry.

What is being checked

Audit and inspection records lead to corrective action.

Ready on board

0 / 7 checked

Check the vessel’s actual procedures, equipment and records against these points from RISQ 3.2.

Practice questions

Preparation prompts derived from this entry, not an official inspector interview script.

1Can an audit alone count as a superintendent inspection?

Only where the Marine or Technical Superintendent also prepares a separate qualifying inspection report.

2How are Marine and Technical attendance intervals checked?

Check the overall six-month schedule with one month tolerance and the separate maximum 14-month interval for each discipline.

Where a finding may arise

Missing evidence, ineffective implementation or defects in the arrangements listed above may prevent a satisfactory answer to this question.

Past observations for practice

Anonymised reports, manually reviewed before publication. These are reported experiences, not additional inspection requirements.

No reviewed observations have been added for this entry.

Share an observation for private review

Remove vessel, company and inspector names, report numbers, exact dates and confidential information. Do not paste a complete inspection report.

References and source status

RightShip Inspection Ship Questionnaire, November 2025, version 3.2. Section 4, page 40, reference 4.3.

The explanation, checklist and practice answer derive from the supplied questionnaire. Reported observations are separately contributed and manually reviewed; they are not official RISQ guidance.

Independent DeepDraft preparation guide, based on the supplied RISQ 3.2 questionnaire. Not an official RightShip product or inspection report.