Weather-deck vents and air pipes

RISQ 14.6Section 14 · General Appearance – Hull and SuperstructureSource marking: V

Applicability: Apply to the vessel’s fitted equipment and arrangements, retaining the conditions in each question.

What is being checked

Vents are sound, identified and protected against water ingress.

Ready on board

0 / 3 checked

Check the vessel’s actual procedures, equipment and records against these points from RISQ 3.2.

Practice questions

Preparation prompts derived from this entry, not an official inspector interview script.

1Is a flame screen required by this entry on every vent?

The guidance checks it where fitted; no universal fitting requirement is added.

Where a finding may arise

Missing evidence, defects or gaps in familiarity against these checks may prevent a satisfactory answer. These are derived preparation concerns, not additional explicit finding criteria or reported past observations.

Past observations for practice

Anonymised reports, manually reviewed before publication. These are reported experiences, not additional inspection requirements.

No reviewed observations have been added for this entry.

Share an observation for private review

Remove vessel, company and inspector names, report numbers, exact dates and confidential information. Do not paste a complete inspection report.

References and source status

RightShip Inspection Ship Questionnaire, November 2025, version 3.2. Section 14, page 213, reference 14.6.

The explanation, checklist and practice answer derive from the supplied questionnaire. Reported observations are separately contributed and manually reviewed; they are not official RISQ guidance.

Independent DeepDraft preparation guide, based on the supplied RISQ 3.2 questionnaire. Not an official RightShip product or inspection report.