Anchoring design limitations

RISQ 10.21Section 10 · Mooring OperationsSource marking: V

Applicability: Apply to the vessel’s mooring and anchoring arrangements, retaining the equipment-specific conditions in each entry.

What is being checked

The Master understands the actual equipment’s design assumptions.

Ready on board

0 / 4 checked

Check the vessel’s actual procedures, equipment and records against these points from RISQ 3.2.

Practice questions

Preparation prompts derived from this entry, not an official inspector interview script.

1Are the source’s wind/current figures permission to remain anchored up to those values?

No. They describe assumptions in a cited design explanation, not universal safe operating limits.

Where a finding may arise

Missing evidence, defects or gaps in familiarity against these checks may prevent a satisfactory answer. These are derived preparation concerns, not additional explicit finding criteria or reported past observations.

Past observations for practice

Anonymised reports, manually reviewed before publication. These are reported experiences, not additional inspection requirements.

No reviewed observations have been added for this entry.

Share an observation for private review

Remove vessel, company and inspector names, report numbers, exact dates and confidential information. Do not paste a complete inspection report.

Source clarification

The source cites a 2010 explanation using 2.5 m/s current, 25 m/s wind and scope 6–10. These values do not establish current universal Class criteria or an operating envelope for the individual ship.

References and source status

RightShip Inspection Ship Questionnaire, November 2025, version 3.2. Section 10, page 189, reference 10.21.

The explanation, checklist and practice answer derive from the supplied questionnaire. Reported observations are separately contributed and manually reviewed; they are not official RISQ guidance.